The Cambodia Rural School Project
|
|
Number of School:
|
31 |
|
Name of School:
|
The Paul Singh School |
|
Name of Donor:
|
Paul Singh |
|
Location of School |
|
|
Province:
|
Prey Veng |
| District: | Peam Chor |
| Commune: | Veal Robang Loeu |
| Village: | Veal Robang Loeu |
|
Status:
|
Complete |
| Start of Construction: | April 28, 2000 |
| End of Construction: | October 1, 2000 |
| District Population: | 58,012 |
| Student Body: | 229 |
| Teaching Staff: | 4 |
| Classrooms: | 3 |
| Average students per class: | 40 |
| Distance from Phnom Penh: | 70 km |
| Travel Time: | 3:00 (all year) |

The school is on stilts to protect the building from the
floods of the rainy season (Mar. 2001)

The
Paul Singh School is built on stilts to protect it from the annual flooding.
These photos were taken towards the end of rainy season. (September, 2001)